Please contact us for more information. China unveils the world’s first military-grade mobile 5G base station, developed by China Mobile Communications Group and the PLA, designed for battlefield use to enable seamless communication for up to 10,000 military robots and drones within a 3-kilometer radius.
By the end of 2020, three major domestic mobile network operators have built over 718,000 5G base stations in China and achieved 5G coverage in more than 300 cities throughout the country (see Fig. 1 and Table S1). 5G base stations are mainly distributed along with coastal cities in the southeast provinces.
However, a significant reduction of ca. 42.8% can be achieved by optimizing the power structure and base station layout strategy and reducing equipment power consumption. Overall, this study provides a clear approach to assess the environmental impact of the 5G base station and will promote the green development of mobile communication facilities.
When operating near existing 5G civilian areas, the PLA also has ways to piggyback China’s 4.2 million base stations. This can be achieved autonomously and in “the blink of an eye.” “The operation of such a vast network necessarily requires powerful automation tools and means, among which automatic station opening technology is one.
The clean energy projects at the base are planned to have an installed capacity of 6 million kW, which includes 4.5 million kW of wind power and 1.5 million kW of solar power. Construction of the supporting energy storage facilities is also included.
It was constructed in conjunction with the CHN Energy’s East Ningxia 1.5 GW Composite Photovoltaic Base Project, with a planned total capacity of 200 MW/400 MWh.
All projects at the base are scheduled to be put into operation within China's 14th Five-Year Plan (2021-25) period. Once operational, the base is expected to export 24 billion kWh of power annually to East China’s Shandong Province through the ultra-high-voltage power transmission line.
Once operational, the base is expected to generate more than 14 billion kWh of clean power, equaling that produced by burning 4.2 million tons of standard coal and a reduction of 11 million tons of carbon dioxide. State-owned Assets Supervision and Administration Commission of the State Council All rights reserved.